Welcome to Cangzhou Zhen Tian pipeline equipment manufacturing Co., Ltd.
Cangzhou Zhen Tian pipeline equipment manufacturing Co., Ltd.
The current position: en > Product > Precision casting >

Elbow

Power plant accessories

Insulation pipe fittings

Thermal insulation pipe

Corrugated compensator

Flange

Head

Reducer

Tee/four-way

Bend

Spring hanger

Manhole

Forged Fittings

Precision casting

Thread reducing tee
Thread reducing tee
  • PRODUCT NAME:

    Thread reducing tee

  • DESCRIPTION:
    The hardness of a good wear resistance superhard wear alloy is greater than 46 (HRC), which has good wear resistance and thermal stability...

DESCRIPTION

Three-way thread reducing performance:

1. The hardness of a good wear resistance superhard wear alloy is greater than 46 (HRC), which has good wear resistance and thermal stability.

2. Good anti-impact performance, metal binding performance and thermal shock resistance thread reducing tee, the bonding surface of the two metals is completely metallurgical bonding and reliable in use. The coefficient of thermal expansion is equal to that of expansion, shrinkage and crack. The outer wall of the elbow is made of steel tube and the inner lining is made of super-hard wear-resistant alloy.

3. Good resistance to heat and corrosion. The matrix of super hard alloy material has strong resistance to heat and corrosion. Under the action of wet state, corrosion medium and particle scour, it is more suitable to use the superhard wear-resistant alloy. Under the condition of dry state in which abrasive wear is the main failure mode, a kind of superhardness wear-resistant alloy material which can be obtained by heat treatment is selected.

4. Low composite cost and good quality. The wear-resistant tube is manufactured by epc casting process with high yield, good density, uniform thickness and stable quality.

5. Convenient transportation, installation and use, bimetal composite wear-resistant pipe can be connected by flange, quick joint and direct welding, etc. In addition, due to the high resistance and beating performance of the composite pipe, when partial blockage occurs in the pipe system maintenance, it can be knocked or hammered at will, and can be cut, unloaded, welded and installed at will.


NEWS

News

Copyright © 2018 - 2019 Cangzhou Zhen Tian pipeline equipment manufacturing Co., Ltd. All Right Reserved.